 Irrigation Rehabilitation Program 2006/2007 Status Report
.
Table 2: Project Construction
  DateRehabilitation Completed 
District
 
Project
#
ICW
/MW
Project Name
 
Project Approval
 
Construction
Start
% Completed
in 06/07
% Complete
to July 31/07
Liners
(lengths in metres)
Pipe
 
Earth
 
AID 2042
ICW
Main Canal Extension
2007 01
2007 05
100%
100%
300
AID2070
ICW
Main Canal Check Structures2006 022007 04
100%
100%
install checks and gates
BRID2026
ICW
Laterals C1, C2, C3 Hays
2006 02
2006 11
100%
100%
18012
BRID2044
ICW
Lomond Lateral
2006 02
2006 10
100%
100%
3502
BRID2091
ICW
Flow Measurement 2007
2007 02
2007 05
65%
65%
install 5 of 8 flow measurement stations
EID2057
ICW
Lateral G North Bantry
2006 02
2006 10
100%
100%
19656
LID2072
ICW
Coulee Delivery
2006 02
2007 01
100%
100%
1827
LID2081
ICW
Hamlet of Leavitt Lateral
2006 09
2006 12
100%
100%
1840
LNID
1970
PS
LNID Air Photos (2003)
2003 02
2007 07
100%
100%
update aerial photos
LNID
1972
ICW
Lateral C12 Pipeline
2003 02
2006 09
100%
100%
15505
LNID
2041
ICW
Lateral 61C South Park Lake
2005 03
2005 11
50%
100%
400
MID
1983
ICW
Highline Pipeline
2004 02
2006 09
45%
45%
4533
MID
2098
ICW
Real Time Measurement on Return Flow Sites
2007 02
2007 04
100%
100%
upgrade two sites
RID
2060
ICW
Stirling #4
2006 02
2006 10
95%
95%
5859
RCID
2013
ICW
RCID Closed Pipeline
2004 02
2006 02
30%
95%
5200
SMRID
1761
MW
Northeast Lateral
1997 02
2006 10
100%
100%
987
1245
SMRID
1862
BOTH
North Lateral Gravel Armouring
2001 02
2002 10
10%
53%
1627
SMRID
1866
ICW
Bow Island Laterals 28, 28C, 30
2002 05
2003 02
19%
100%
7539
SMRID
1878
ICW
Lateral 10B
2001 08
2001 11
8%
73%
2653
SMRID
1991
ICW
Yellow Lake Lateral 5
2004 02
2004 10
29%
100%
2526
SMRID
1992
ICW
South Medicine Hat Lateral 2
2004 02
2005 03
50%
100%
7391
SMRID
2023
ICW
Whoop-Up Lateral
2005 02
2006 10
25%
25%
4032
SMRID
2049
ICW
Pipeline Turnout Flow Monitoring
2005 11
2006 05
60%
100%
install 120 gauges
SMRID
2050
ICW
South Medicine Hat Lateral 10
2006 02
2007 03
100%
100%
3176
TID
2061
ICW
Southeast Big Bend Drain
2006 02
2006 10
100%
100%
3417
TID
2063
ICW
Siphon from Taber Lake Reservoir
2006 02
2006 11
100%
100%
115
200
TID
2065
ICW
Electric Assisted Gate Operators
2006 04
2007 03
100%
100%
install 4 power operators
TID
2076
ICW
Pipeline Drain Lines
2006 06
2006 04
45%
65%
2187
TID
2087
ICW
Lateral 20 Taber
2007 02
2007 03
95%
95%
1446
TID
2088
ICW
Lateral G7 Big Bend
2007 02
2007 04
100%
100%
615
UID
1963
ICW
Lateral B13
2003 02
2007 03
100%
100%
4465
UID
1964
ICW
Lateral A4b
2003 02
2006 10
100%
100%
1315
UID
2000
ICW
Lateral F
2004 02
2006 09
15%
100%
1063
UID
2095
ICW
Lateral D Return Flow Measurement
2007 02
2007 05
100%
100%
recording station
WID
1848
ICW
Lateral 82K15
2006 02
2006 09
100%
100%
9248
WID
2047
ICW
Hammerhill Spillway Turnout
2006 02
2006 12
100%
100%
cast-in-place structure
WID
2068
MW
Secondary A Canal
2006 08
2006 11
100%
100%
1011
4164
WID
2083
PS
Aquatic Weed and Algae Control Study
2007 02
2007 02
100%
100%
report
WID
2097
ICW
Secondary A Canal SCADA System
2007 02
2007 04
100%
100%
four sites
700123,10913,247
TOTAL 137,056
 
 
 
 