Custom Rates 2017 - Land Clearing and Breaking | |
|
|
|
|
|
|
| These are survey results only - not recommended rates.
Land Clearing & Breaking
.
Operation | Location | Most Common 2015 | Range 2016 | Most Common 2016 |
Brushing & piling or repiling
(with a dozer blade)
- trucking not included | Alberta |
D3 | $125/hr | $125/hr | $125/hr |
D5 or D6 (140-180hp) | $130-150/hr | $130-150/hr | $130-150/hr |
D7 (180-200hp) | $185-250/hr | $160-250/hr | $185-250/hr |
D8 (225-335hp) | $210-250/hr | $210-250/hr | $210-250/hr |
Loader | $200/hr | $200/hr | $200/hr |
Smaller units - fuel not included | $115-125/hr | $115-160/hr | $115/hr |
Total reports = 53 Surveyed Fall 2016 |
Brush & Mulch | Alberta | ...- | $260/hr | $260/hr |
Total reports = 5 Surveyed Fall 2016 |
Ripping or sub-soiling
- trucking not included | Alberta | $155-225/hr | $145-250/hr | $155-225/hr |
Total reports = 50 Surveyed Fall 2016 |
Discing
(higher rates for remote locations or tough terrain) | Alberta | $220/hr | $140-220/hr | $220/hr |
Total reports = 7 Surveyed Fall 2016 |
Breaking plow | Alberta | $45/ac | $45/ac | $45/ac |
Total reports = 1 Surveyed Fall 2016 |
Rototilling | Alberta | $115/hr | $115/hr | $115/hr |
Total reports = 6 Surveyed Fall 2016 |
Dugout construction, drainage, feedlot construction & land leveling
- trucking not included to site | Alberta |
D6 Cat | $150/hr | $130-150/hr | $150/hr |
D7 Cat | $178-200/hr | $160-225/hr | $178-200/hr |
D8 Cat | $225-250/hr | $225-250/hr | $225-250/hr |
Backhoe | $130/hr | $130/hr | $130/hr |
Dozers | $115/hr | $115/hr | $115/hr |
Dump trucks | $100-110/hr | $100-110/hr | $100-110/hr |
Excavators | $120-185/hr
$2/cu yd | $90-255/hr
$2/cu yd | $120-185/hr
$2/cu yd |
Graders | $130/hr | $130/hr | $130/hr |
Scrapers | $250-300/hr | $160-300/hr | $250-300/hr |
Total reports = 73 Surveyed Fall 2016 |
Rock picking | Alberta | $120/hr
$9-10/ac | $120/hr
$9-10/ac | $120/hr
$9-10/ac |
Total reports = 4 Surveyed Fall 2016 |
|
|
|
|
|
|
Other Documents in the Series |
|
|
Custom Rates Survey Summary 2017 Custom Rates 2017 - Land Leasing Custom Rates 2017 - Seeding Custom Rates 2017 - Land Clearing and Breaking - Current Document Custom Rates 2017 - Tillage Custom Rates 2017 - Livestock Custom Rates 2017 - Haying and Silage Custom Rates 2017 - Grain Harvesting and Hauling
|
|
|
|
|
|
For more information about the content of this document, contact Ted Nibourg.
This document is maintained by Mary Ann Nelson.
This information published to the web on September 25, 2017.
Last Reviewed/Revised on October 4, 2017.
|
|