Taber Irrigation District (TID) | |
| |
|
|
| |
|
|
| | During this reporting period the TID expended $1,383,728 of IRP cost shared funds on 27 projects in the ICW category. Some expenditures involved cleanup of previously completed IRP projects or engineering only for upcoming projects. Those projects with significant construction in 2006/2007 are listed below.
....

 | 
 |

Project #2065, Electric Assisted Gates.
Old crank style gate operators. | 
Project #2065, Electric Assisted Gates.
Solar powered gate operators. |
.
TID IRP Project Construction Summary
August 1, 2006 to July 31, 2007
| Date | Rehabilitation Completed |
IRP #
| ICW
MW
PS | Project
Name | Project Approved | Construction
Start | % Completed in 06/07 | % Completed to July 31/07 | Liners (metres) | Pipe
(metres)
| Earth
(metres)
|
2061 | ICW | Southeast Big Bend Drain | 2006 02 | 2006 10 | 100% | 100% | 3417 |
2063 | ICW | Siphon from Taber Lake Reservoir | 2006 02 | 2006 11 | 100% | 100% |  | 115 | 200 |
2065 | ICW | Electric Assisted Gate Operators | 2006 04 | 2007 03 | 100% | 100% | Install 4 power operators |
2076 | ICW | Pipeline Drain Lines | 2006 06 | 2006 04 | 45% | 65% | 2187 |
2087 | ICW | Lateral 20 Taber | 2007 02 | 2007 03 | 95% | 95% |  | 1446 |
2088 | ICW | Lateral G7 Big Bend | 2007 02 | 2007 04 | 100% | 100% | 615 |
|  | 6334 | 1646 |
|
|
| |
|
|
| |
For more information about the content of this document, contact Don Gross.