Taber Irrigation District (TID)

 
 
Subscribe to our free E-Newsletter, "RTW This Week"Sign up for our
E-Newsletter
 
 
 
 During this reporting period the TID expended $1,383,728 of IRP cost shared funds on 27 projects in the ICW category. Some expenditures involved cleanup of previously completed IRP projects or engineering only for upcoming projects. Those projects with significant construction in 2006/2007 are listed below.
....



Project #2065, Electric Assisted Gates.
Old crank style gate operators.

Project #2065, Electric Assisted Gates.
Solar powered gate operators.
.
TID IRP Project Construction Summary
August 1, 2006 to July 31, 2007
  
Date
Rehabilitation Completed
IRP #
 
ICW
MW
PS
Project
Name
Project Approved
Construction
Start
% Completed in 06/07
% Completed to July 31/07
Liners (metres)
Pipe
(metres)
 
Earth
(metres)
 
2061
ICW
Southeast Big Bend Drain
2006 02
2006 10
100%
100%
 3417
2063
ICW
Siphon from Taber Lake Reservoir
2006 02
2006 11
100%
100%
115
200
2065
ICW
Electric Assisted Gate Operators
2006 04
2007 03
100%
100%
Install 4 power operators 
2076
ICW
Pipeline Drain Lines
2006 06
2006 04
45%
65%
2187
2087
ICW
Lateral 20 Taber
2007 02
2007 03
95%
95%
  1446
2088
ICW
Lateral G7 Big Bend
2007 02
2007 04
100%
100%
615
 
6334
1646

 
 
 
 
For more information about the content of this document, contact Don Gross.
This document is maintained by Bob Winter.
This information published to the web on June 17, 2005.
Last Reviewed/Revised on February 4, 2008.