 During this reporting period the AID constructed two projects in the ICW category. These projects are listed below.
.
Project #2070, Main Canal Checks.
Precast checks with automated Lopac gates installed to control upstream water levels.

AID IRP Project Construction Summary
August 1, 2006 to July 31, 2007
 
Date
Rehabilitation Completed
IRP #
 
ICW
MW
PS
Project
Name
 
Project Approved
Construction
Start
 
% Completed in 06/07
% Completed to July 31/07
Liners (metres)
Pipe
(metres)
 
Earth
(metres)
 
2042
ICW
Main Canal Extensions
2007 01
2007 05
100%
100%
300
2070
ICW
Main Canal Checks
2006 02
2007 04
100%
100%
Install checks with Lopac gates
 
 
 
 
For more information about the content of this document, contact Don Gross.
This document is maintained by Bob Winter.
This information published to the web on June 17, 2005.
Last Reviewed/Revised on February 8, 2008.