Aetna Irrigation District (AID) | |
| |
|
|
| |
|
|
| | During this reporting period the AID constructed two projects in the ICW category. These projects are listed below.
.
Project #2070, Main Canal Checks.
Precast checks with automated Lopac gates installed to control upstream water levels.
AID IRP Project Construction Summary
August 1, 2006 to July 31, 2007
| | Date | Rehabilitation Completed |
IRP #
| ICW
MW
PS | Project
Name
| Project Approved | Construction
Start
| % Completed in 06/07 | % Completed to July 31/07 | Liners (metres) | Pipe
(metres)
| Earth
(metres)
|
2042 | ICW | Main Canal Extensions | 2007 01 | 2007 05 | 100% | 100% | 300 |  |  |
2070 | ICW | Main Canal Checks | 2006 02 | 2007 04 | 100% | 100% | Install checks with Lopac gates |
|
|
| |
|
|
| |