,
 

Custom Rates 2009 - Tillage and Seeding

 
 
Subscribe to our free E-Newsletter, "RTW This Week"Sign up for our
E-Newsletter
 
 
 
 Tillage | Seeding | Fertilizer application | Herbicide application | Machinery rental | Soil testing

These are survey results only - not recommended rates.

NOTES: *Indicates one report received.

Tillage

OperationLocationMost Common 2007Range 2008Most Common 2008
Plowing– hay & pastureAlberta $110-120/hr $110-120/hr $110-120/hr
Total reports = 3 Surveyed Fall 2008
Discing – crop & stubble Alberta $120-150/hr $115-165/hr .$130-165/hr
– hay & pasture Alberta $120-165/hr $110-200/hr $120-165/hr
Total reports = 45 Surveyed Fall 2008
Rototilling– hay & pastureAlberta $100/hr.$80-100/hr$80-100/hr
Total reports = 7 Surveyed Fall 2008
CultivatingAlberta $10/ac
$120/hr*
$10/ac*
$110-120/hr
$10/ac*
$110-120/hr
Total reports = 7 Surveyed Fall 2008
Harrowing Alberta$3.50-6.50/ac$4.50-6.50$4.50-6.50
Total reports = 4 Surveyed Fall 2008
Harrowing & packingAlberta $3-3.50/ac.$6.50-7.50$6.50-7.50
Total reports = 2 Surveyed Fall 2008
Land RollingAlberta$7-10/ac$5-10/ac$7-10/ac
Total reports = 7 Surveyed Fall 2008

Seeding

OperationLocationMost Common 2007Range 2008Most Common 2008
Seeding – air seeder/airdrillAlberta$13-16/ac$14-23/ac$15-18/ac
Total reports = 14 Surveyed Summer & Fall 2008
Seeding – floater truckSouth$6-6.75/ac$5.40-7.50$6.50-7.50
Central$6.90-7.75/ac$6.50-16/ac$7.50-9/ac
North$6.95-7.75/ac$7-11/ac$7.50-8.95/ac
Peace$5.50/ac$6.50/ac*$6.50/ac*
Total reports = 63 Surveyed Summer & Fall 2008
Seeding – aerialAlberta$7/ac$7.50/ac$7.50/ac
Total reports = 7 Surveyed Summer & Fall 2008
Seeding – no-till drillAlberta$15-20/ac$11.50-25/ac$16-20/ac
Total reports = 24 Surveyed Summer & Fall 2008
Seeding – corn planterAlberta$27/ac
**No response to survey
**No response to survey
Total reports = 0 Surveyed Summer & Fall 2008

Fertilizer Application

OperationLocationMost Common 2007Range 2008Most Common 2008
Liquid or granular fertilizer application – floater truck South$5.75-8/ac$4.75-8/ac$5.50-7.50/ac
Central$6.40-7.75/ac$6.25-10.75/ac$6.75-8.25/ac
North$5.50-6.95/ac
...-
$5.95-9.50/ac
$20/load*
$6.50-8/ac
$20/load*
Peace$5-5.50/ac$6/ac*$6/ac*
Total reports = 170 Surveyed Summer & Fall 2008
Liquid or granular fertilizer application – fixed-wing aerial Alberta$6.45-7.25/ac$7.50-9.10/ac$7.50-9.10
Total reports = 35 Surveyed Summer & Fall 2008
Granular - pull-typeAlberta$20/load*.
**No response to survey
**No response to survey
Total reports = 0 Surveyed Summer & Fall 2008
Anhydrous fertilizer application – cultivator with cold flow kit Alberta$12/ac*
$70/tonne*.
$15/ac*
$30-70/tonne*
$15/ac*
$30-70/tonne*
Total reports = 2 Surveyed Summer & Fall 2008

Herbicide Application

OperationLocationMost Common 2007Range 2008Most Common 2008
Granular herbicide application –
floater truck
South$6.50-7.25/ac$5.75-7.50/ac$6.50-6.75/ac
Central$5.75-6.25/ac$6.50-6.75/ac$6.50-6.75/ac
North$6.50/ac$8/ac*$8/ac*
Peace$5.50ac
**No response to survey
**No response to survey
Total reports = 19 Surveyed Summer & Fall 2008
Liquid herbicide application –
floater truck
Alberta$7.75/ac
$275/hr*
$7.75/ac
$300/hr*
$7.75/ac
$300/hr*
Total reports = 8 Surveyed Summer & Fall 2008
Liquid or granular herbicide application – truck mount Alberta$2.65-5.50/ac $3-5/ac$3-5/ac
Total reports = 4 Surveyed Summer & Fall 2008
Liquid herbicide application – high clearanceSouth$6.25-7.50/ac$4.60-10/ac$6-7.25/ac
Central$6.25-7.50/ac$6.25-13.75/ac$6.75-7.60/ac
North$5.75-7/ac$5.25-8.50/ac$5.75-7.50/ac
Peace$5-5.50/ac$5.45-20/ac$12-20/ac
Total reports = 148 Surveyed Summer & Fall 2008
Liquid herbicide application – fixed-wing aerial South$6.80-7.50/ac$8.20-9.10/ac$8.20-9.10/ac
Central$6.50-7.50/ac$7.50-9.10/ac$7.50-8.75/ac
North$7-8/ac$7.50/ac$7.50/ac
Peace$7-9/ac
**No response to survey
**No response to survey
Total reports = 42 Surveyed Summer & Fall 2008
Liquid herbicide application - pull-typeAlberta$7.50/ac*
**No response to survey
**No response to survey
Total reports = 0 Surveyed Summer & Fall 2008

Machinery Rental

OperationLocationMost Common 2007Range 2008Most Common 2008
Anhydrous ammonia applicator – pull type
(rental cost with product purchase)
Alberta$1.50-3/ac
$30-40/tonne
$70/ton
$1.25-3/ac
$20-30/tonne
...-
$1.50-3/ac
$20-30/tonne
...-
Total reports = 24 Surveyed Summer & Fall 2008
Liquid fertilizer applicator – pull type
(rental cost with product purchase)
Alberta$0.50/ac
$250/setup
$0.50/ac
...-
$0.50/ac
...-
Total reports = 4 Surveyed Summer & Fall 2008
Granular fertilizer applicator – pull type
(rental cost with prouct purchase)
South$0.50-1/ac
$7-12/tonne
$75/day
$0.50-1.25/ac
$7-12/tonne
$100/day
$0.50-1/ac
$7-12/tonne
$100/day
Central$1-2/ac
$9.75-27/tonne
$50-100/day
$1.70-3.50/ac
$8/tonne
$50-150/day
$2-3.50/ac
$8/tonne
$100-150/day
North$1/ac
$8-10/tonne
$75-100/day
$2-3.50/ac
$7-10/tonne
$75/day
$2-3.50/ac
$10/tonne
$75/day
Peace$75/day...-...-
Total reports = 66 Surveyed Summer & Fall 2008
Granular herbicide applicator – pull type
(rental cost with product purchase)
Alberta$1.50-2.50/ac
$75/day
$1-2/ac
...-
$1.50-2/ac
...-
Total reports = 12 Surveyed Summer & Fall 2008
Land RollerAlberta$2-3/ac
$500/day*
$1.75-3/ac
...-
$2-3/ac
...-
Total reports = 11 Surveyed Summer & Fall 2008
Breaking discAlberta$5.50/ac
$400-475/day
$5.50/ac
$300-525/day
$5.50/ac
$300-525/day
Total reports = 34 Surveyed Summer & Fall 2008
Heavy harrowAlberta$1.75-2.50/ac$1.75-2.50/ac$1.75-2.50/ac
...-$350/day*$350/day*
Total reports = 13 Surveyed Summer & Fall 2008

Soil Testing

OperationLocationMost Common 2007Range 2008Most Common 2008
Soil testing
(lab fees included)
Alberta
Four nutrients$50-85/field$32-150/field$55-100/field
Four nutrients with micronutrients$70-105/field$55-175/field$75-110/field
Variable rate technology...-$10/ac$10/ac
Complete pH, organic & micronutrients$85/field$85/field$85/field
Soil sampling
(lab fees not included)
$20-25/field$25-30/field$30/field
Total reports = 144 Surveyed Summer & Fall 2008

 
 
 
 

Other Documents in the Series

 
  Custom Rates Survey Summary 2009
Custom Rates 2009 - Average Alberta Farm Input Prices 2008
Custom Rates 2009 - Grain Harvesting & Hauling
Custom Rates 2009 - Haying and Silage
Custom Rates 2009 - Land Clearing and Breaking
Custom Rates 2009 - Land Leasing
Custom Rates 2009 - Livestock
Custom Rates 2009 - Tillage and Seeding - Current Document
 
 
 
 
For more information about the content of this document, contact Ted Nibourg.
This document is maintained by Mary Ann Nelson.
This information published to the web on January 22, 2009.
Last Reviewed/Revised on March 19, 2009.