| |
Custom Rates 2009 - Land Clearing and Breaking | |
| |
|
|
| |
|
|
| | Land Clearing & Breaking
.
| Operation | Location | Most Common 2007 | Range 2008 | Most Common 2008 |
Brushing & piling or repiling
(with a dozer blade) | Alberta |
| D5 or D6 (140-180hp) | $125-135/hr | $110-155/hr | $125-150/hr |
| D7 (180-200hp) | $130-155/hr | $120-190/hr | $130-175/hr |
| D8 (225-335hp) | $150-185/hr | $150-220/hr | $150-210/hr |
| Total reports = 76 Surveyed Fall 2008 |
| Ripping or sub-soiling | Alberta | $155-220/hr | $140-255/hr | $155-225/hr |
| Total reports = 44 Surveyed Fall 2008 |
Discing
(higher rates for remote locations or tough terrain) | Alberta | $120-155/hr
$40/ac | $110-200/hr
...- | $130-165/hr
...- |
| Total reports = 24 Surveyed Fall 2008 |
| Plowing | Alberta | $110/hr
$27/ac | $110-115/hr
...- | $110-115/hr
...- |
| Total reports = 2 Surveyed Fall 2008 |
| Rototilling | Alberta | $100/hr | $100/hr | $100/hr |
| Total reports = 6 Surveyed Fall 2008 |
| Dugout construction, drainage, feedlot construction & land leveling | Alberta |
| D6 Cat | $118-135/hr | $115-155/hr | $118-135/hr |
| D7 Cat | $130-165/hr | $120-190/hr | $130-175/hr |
| D8 Cat | $150-210/hr | $150-220/hr | $150-210/hr |
| Backhoe | $90-140/hr | $90-140/hr | $90-140/hr |
| Excavators | $140-195/hr
$1.75-2.50/cu yd | $100-255/hr
$1.25-2.50/cu yd | $150-200/hr
$1.75-2.50/cu yd |
| Scrapers | $195-250/hr | $120-250/hr | $195-250/hr |
| Loaders | $125/hr | $90/hr | $90/hr |
| Skid steers | $75/hr | $75/hr | $75/hr |
| Dump trucks | $90-120/hr | $90-120/hr | $90-120/hr |
| Total reports = 293 Surveyed Fall 2008 |
| Brush mowing | Alberta | $110-130/hr | $120-130/hr | $120-130/hr |
| Total reports = 8 Surveyed Fall 2008 |
| Brush & mulch | Alberta | $260/hr | $260/hr | $260/hr |
| Total reports = 5 Surveyed Fall 2008 |
| Rock picking | Alberta | $175/hr. | $175/hr | $175/hr |
| Total reports = 5 Surveyed Fall 2008 |
| Rock raking | Alberta | $100/hr | $100/hr | $100/hr |
| Total reports = 5 Surveyed Fall 2008 |
| Tree moving | Alberta | $95/hr* | $95/hr | $95/hr |
| Total reports = 2 Surveyed Fall 2008 |
|
|
| |
|
|
| |
Other Documents in the Series |
|
| |
Custom Rates Survey Summary 2009 Custom Rates 2009 - Average Alberta Farm Input Prices 2008 Custom Rates 2009 - Grain Harvesting & Hauling Custom Rates 2009 - Haying and Silage Custom Rates 2009 - Land Clearing and Breaking - Current Document Custom Rates 2009 - Land Leasing Custom Rates 2009 - Livestock Custom Rates 2009 - Tillage and Seeding
|
|
| |
|
|
| |
For more information about the content of this document, contact Ted Nibourg.
This document is maintained by Mary Ann Nelson.
This information published to the web on January 21, 2009.
Last Reviewed/Revised on April 20, 2009.
|
|